Which is....Becky!

And the winner of the second prize (the $25 iTunes gift card) goes to number 13...
Which is...Elizabeth!

Congratulations to you both! I'm emailing you for your addresses, and your prizes will be on their way! Thanks, everyone, for playing along, and sending me your amazing-sounding recipes!
(Note:The total number of entries in the contest was 70; however, one didn't contain a recipe, per the contest instructions, and one was a duplicate comment. Hence, the total number of entries was reduced to 68.)



2 comments:
Yay, thank you so much!!
:)
This is the first prize I've won since I got a goldfish in third grade for throwing a ping pong ball into a bottle. The goldfish died in two days.
My e-mail's on my web page, but I'll give it to you here so you don't have to click through: elizabeth(dot)arnold(at)yahoo(dot)com.
Thank you!!
Hi
Quality assurance is implemented at the schematic design stage. Mansour Engineering’s quality assurance is an inclusive review of each discipline as well as an overall discipline coordination. Quality assurance procedures include analysis of the worst case scenario for verification of specific design parameters and for each discipline’s task. Project management overview integrates schedule and cost control into each and every aspect of design. Mansour Engineering project management objective is to develop a design that satisfies all requirements and is economically feasible to construct. To that end, cost estimating is within the preview and capabilities of each discipline project leader. Without sacrificing quality control or cost control, Mansour Engineering understands that scheduling is of the utmost importance. Mansour Engineering prepare a detailed timeline for each item on the project deliverable list and proceed on schedule by adjusting manpower activity to finish on time.
[url=http://www.mansour.ca] click here to go to Mansour Engineering[/url]
http://www.mansour.ca
Post a Comment